Goods, etc., construction common
Q1. Are all bids posted on the website?
In principle, designated competitive bidding and general competitive bidding will be posted on the website and Business Chance Navi 2020 (https://www.sekai2020.tokyo/bcn/). Please note that from December 12, 2020, voluntary nominated competitive bidding projects will only be posted on Business Chance Navi XNUMX.
Q2. I would like to obtain the tender form.
Please download from the following link. (Tender documents are usually not used when bidding using Business Chance Navi 2020.)
https://www.houjin-tmu.ac.jp/keiyaku/seido/keiyaku5500/
Q3. I would like to decline the bid.
If you wish to decline a bid, please submit a notice of decline. (If you do not submit a notice of withdrawal, you will not be allowed to attend.) The format of the notice of decline is free. You can also write "Decline" in the amount column of the bid form (fill in the subject, address, date (bid date), address, representative's name, etc., affix the seal of the representative or designated agent, and write " (Please indicate "Declined.") When bidding using Business Chance Navi 2020, please select decline and register during the bidding period.
Q4. If there are multiple bids scheduled for the same period, can I apply for multiple bids at the same time?
Is possible. In that case, please indicate your desired ranking in the designated area on the preference form.
Q5. If I submit a request form, will I be able to participate in the bidding unconditionally?
It is necessary to meet the application requirements established for each case. In addition, even if a request form is submitted, it does not necessarily mean that you will be able to participate in the bid, such as when there are a large number of bidders.
Construction
Q1. Is it possible to change the engineers scheduled to be assigned during the process??
Changes can be made up until bid opening.
Q2. Is the track record recorded in the construction record record the track record of the engineer scheduled to be assigned listed in the request form??
Normally, please enter your company's achievements (not the engineer's achievements). However, depending on the project, we may require the engineer's track record. In that case, please check the published information.
Q3. Does 〇〇 (specific construction details) correspond to actual results??
The construction results will be reviewed based on those listed in the construction record and for which supporting documents such as contracts have been submitted. If you have any questions, please write them down and we will check them here. Please be sure to report any construction work for which this corporation is the contracting party (work completed after the beginning of the fiscal year (April 1st), which falls three years before the date of publication).
Q4. Is it okay to include JV projects in the construction record??
You may also include JV projects. In that case, please state your company's ratio and attach documents that confirm that it meets the application requirements.
Q5. What should I write in “Construction in progress” on the construction request form and schedule supervising engineer record??
Please describe the construction work currently being carried out at your company to the extent possible. (There are no conditions such as construction type or scale.)